Present: Jim Combs, Travis Mathes, Sid, Sarah, Engineers- Laura, Chris M, and Chase B., Nathan, Chris (Electrical Engineer)

Design and Building schedule was reviewed.

Classroom design review discussion
- location of LVT flooring in classrooms was identified
- location of tack and marker boards indicated and approved
- Flooring in the corridors was discussed- VCT was approved
- Decision to NOT provide a drinking fountain in the classroom addition to conserve cost

Gym Design review discussion
- volleyball, basketball, and scoreboard locations were reviewed- manual height adjustment was approved
- gym duct height discussed
- concessions layout reviewed
- road location was reviewed and approved

Mechanical discussion
- sewer utility work
- high pressure gas supply will be routed over existing building and reconnect to maintenance office
- gas supply volume adequacy needs to be verified by KGS
- air ventilation design in weight room/storm shelter needs to be determined
- the separate ERV unit for weight room and locker rooms will be eliminated

Electrical discussion
- new transformer and feeder locations discussed
- light alternates were confirmed
- power plans reviewed
- engineer will indicate smoke sensors for fire alarm system instead of duct detectors

NO ADDITIONAL DESIGN MEETINGS HAVE BEEN SCHEDULED AT THIS TIME!

(see project action deadlines in June 7 post)
Posted by nathan.reed On 28 June, 2017 at 8:39 AM  3 Comments

Comments
Ajay (Guest) said On 14 May, 2018 at 4:58 AM
Get this best option to track <a href="http://dtdccouriertracking.net/">dtdc courier track</a> on here.  
best dissertation service (Guest) said On 23 April, 2018 at 11:54 PM
The classroom designs and school designs should be attractive and great educational methods you can find over here. This usd310 blog has been generating us about the more knowledge developing system and college paper services.   
asdf (Guest) said On 31 March, 2018 at 3:29 AM
high pressure gas supply will be routed over existing building and reconnect to maintenance office  
Leave Your Comment
Security Measure