May 30th 
Highlights of Construction meeting:

-Electrical needs in new gym and weight room addition

wire new gym for eventual sound system

basketball goals and location, whether they are fixed to wall or motorized (possible savings later)

scoreboard location

-Concession stand configuration- wall oven?
*will get Cindy Childs input on concession stand needs

-Outer lighting needs for new structures

-transformer and generator location on east side

-replacing sewer line, the need to do it now if at all.  Life of existing is at the end.

***will meet every week as long as needed now

NEXT MEETING: June 8th at district office- 1pm
Posted by nathan.reed On 08 June, 2017 at 8:33 AM  4 Comments

Comments
https://edugorilla.com/a-career-in-chemical-engineering/ (Guest) said On 11 May, 2018 at 7:28 AM
Nathan Reed, this is a great post. There is some cool info here and I can include that in my https://edugorilla.com/a-career-in-chemical-engineering/ paper and that's what I need to do right now. Thanks for writing this post, Nathan.   
Research Writing by Essayleaks (Guest) said On 07 May, 2018 at 8:32 AM
A beats might be fantastic. You possess numerous especially capable actors. I just aspire most people the right from victory.   
www.essayswritersland.com (Guest) said On 15 April, 2018 at 12:57 PM
Thanks a lot friend for sharing this post on Highlights of Construction meeting over here. The news on Concession stand configuration is really good and interesting though, keep me updated with more.   
Niche relevant blog comment (Guest) said On 29 March, 2018 at 8:01 AM
replacing sewer line, the need to do it now if at all. Life of existing is at the end.  
Leave Your Comment
Security Measure